Page 4 of 38
SPAN 500 BRIDGED TOWER
1.
Preparation
•
Locate the tower level adjusters on each leg at 10cm (4
inches) from the bottom of the leg.
•
Unlock the interlock clips on all frames.
•
When installed, always move the interlock clip to the
“locked”
position.
•
Sort the braces into horizontal and diagonal braces - the
diagonals are slightly longer.
•
Unlock the brace locks
.
2.
Base
Step 1: Install castor into adjustable leg.
Step 2: Ensure interlock clips are released from the base
frames (bottom frames).
Step 3: Install castor / leg assembly to frame by pushing the
leg into the frame tube. This should be done with manual
force only, no tools.
Step 4: Lock castors before ascending any part of the tower.
3.
Locking down the platform (Windlock)
A windlock clip is installed on the platform at the hook. This
is locked as shown here.
ASSEMBLY PREPARATION
10 cm
Unlocked
Locked
Note the locking and unlocking position
for the castors as shown here.
Unlocked
Locked
Unlocked
Locked
Unlocked
Locked