Page 11 of 38
SPAN 500 BRIDGED TOWER
1.
Push castor into adjustable leg
.
Insert adjustable leg into a 2-rung frame and lock
the castor.
Repeat for all other castors.
It is recommended to allow a gap between the
bottom of the adjustable leg and the leg lock for
ease of levelling.
2. Fit one horizontal brace onto the vertical tube of
the frame, just above the collar with the claw
facing outwards. This will support the frame.
Note:
Release brace latch for ease of fitting.
3. Fit horizontal brace onto the opposite vertical
tube of the frame. Position the ladder as shown
and attach horizontal brace to the other 2-rung
frame.
Ensure the frames are square and level by
checking with a spirit level and adjusting the legs
if required.
When tower is level and square, apply the braces
as shown.
6m ASSEMBLY PROCESS