7
Page
IMPORTANT: DO NOT USE EXCESSIVE FORCE DURING
TAKE DOWN. UNDO ALL TIES, STRAPS AND GUY ROPES.
Undo all Veclro straps or ties from around the
roof tubes and cross beams.
Failure to do
so may tear the fabric during take down!
STEP 1
Release push button on each leg and shorten
the frame to its original height.
STEP 3
Remove pegs, guy ropes.
STEP 2
STEP 4
Remove canopy pack away in storage bag,
ensuring first that they’re fully dry.
STEP 5
With a partner on the opposite side, grasp the
middle section of the frame and lift slightly off
the ground. Then slowly walk towards each
other allowing the frame to fold inwards and
come together,
being careful not to catch
your fingers in the frame.
STEP 6
TAKE-DOWN INSTRUCTIONS
Get under the canopy, pull the lower roof hub
down till the frame partially closed and
unlocked.
IMPORTANT: PRINT SPECS
NUMBER OF COLOURS TO PRINT
DO NOT ALTER ARTWORK/DIELINE
3
MAGENTA
YELLOW
BLACK
DIELINE
IMPORTANT: PRINT SPECS
NUMBER OF COLOURS TO PRINT
DO NOT ALTER ARTWORK/DIELINE
3
MAGENTA
YELLOW
BLACK
DIELINE
110mm
Sew into Seam of Carry Bag: OUTSIDE OF BAG / AND GAZEBO CANOPY