background image

FF

J

B

DD

A

Assembly (continued)

STEP 6. Assemble Netting Panels

10

6.1. Use the Ne�ng Ring FF to assemble the Ne�ng Panel J to the Cross Beam. Make 

sure Ne�ng Panel J match correctly to each side of the beams. Slide the Ne�ng Panel J 

open and close, make sure they run smoothly.  

6.2. Hammer Anchor DD through one of the holes at each post base into the ground to 

stabilize the gazebo. 

Summary of Contents for Pinnacle Dia 6414-304

Page 1: ...SKU 6414 304 Pinnacle Dia 13 Roof Style Hexagon Pavilion with All Around Netting Instruction Manual...

Page 2: ...wood stone tiles or concrete using appropriate screws for that flooring or anchored into the ground or grass with proper camp nails or anchors Failure to do so may risk blowing away by wind Check that...

Page 3: ...damage to the gazebo Please always check and tighten the canopy Please take a minute to lose and remove the roof canopy at least before the weather Warning Rainwater may pool here 2 Secure the frame K...

Page 4: ...drill that has a narrow body or has an extension adaptor for certain connections and be sure to use low torque so as not to damage the bolt heads PLANNING ASSEMBLY It will take minimum two people to...

Page 5: ...KAGE CONTENTS 4 Part Qty G Description 1 F 1 H 1 Main Canopy Vent Cover Netting Panel A B C D E F G J H 1 J Part Qty E Description 6 12 6 6 6 A C B D Post Upper Beam Tube Beam Connector Arched Beam Tu...

Page 6: ...Beam Tube C with Plas c Spacer EE in between Note Don not forget to use Plas c Spacer EE while assemble 1 2 Depress the spring loaded pin and insert Upper Beam Tube B and Arched Beam Tube C into Beam...

Page 7: ...2 1 A ach Beam Connector E to Post A with Bolt M6x15 AA Please ask for helping hands as you can during the main frame set up Assembly continued STEP 2 Setting Up the Main Frame 6 A E AA E AA A A A A...

Page 8: ...tinued STEP 3 Attaching the Roof Frame 7 3 1 Depress the spring loaded pin and insert Roof Tube D into Roof Tube Hub F One a er the another un l spring pin pop out and lock the connec on D D D D F D D...

Page 9: ...1 Depress the spring loaded pin and insert Roof Tube D into Post A One a er another un l spring pin pop out and lock the connector Please move and adjust Roof Tube D to line up the hole posi on to all...

Page 10: ...er the frame Pull corner pockets over each Roof Tube D 5 2 Pull the Vent Cover G over the roof frame Extend the Vent Cover G over the frame Pull corner pockets over each Roof Tube D Warining Do not pu...

Page 11: ...FF to assemble the Ne ng Panel J to the Cross Beam Make sure Ne ng Panel J match correctly to each side of the beams Slide the Ne ng Panel J open and close make sure they run smoothly 6 2 Hammer Ancho...

Page 12: ...SKU 6414 304 Code 17JS00040101 Email support casualwayliving com Home Hardware Stores Limited 34 Henry Street West St Jacobs Ontario Canada N0B 2N0...

Reviews: