SECTION 4
-
Installation and Assembly instructions
4 OPTION –
FIRST FIX WITHOUT THE HIU ON SITE
•
Now connect the secondary isolation ball valves.
•
Note the correct connection for flows and returns.
•
Connect the pipework, seal to prevent leaks when the
system is pressurised.
•
Position safety valve discharge pipe for later
connection. There are 2 outlet positions available on
the HIU for this.
•
Ensure all connections are made properly and sealed
•
Ensure all valves are in the closed position
•
Remove the jig by the union connection nuts, safely store
the gaskets for later use.
•
If required, fit temporary plugs to the union nuts of the
isolation valves.
•
Then take the Jig to the next installation and re
-
use as
many times as required.
A temporary Flushing Pipe can be connected between the
valves to enable Flushing before fixing the HIU.
•
Primary side
•
Secondary side heating
•
Secondary side Cold feed / DHWS
Reminder!
•
pipework for SAFETY VALVE DISCHARGE!
Discharge as per latest applicable Building Regulations
Stage
4.4
Stage
4.5
09/17 E & OE