ADDING WATER TREATMENT

To add water treatment chemicals via the IntaKlean, first ensure the system is
appropriately isolated then close the upper ball valve leaving the lower valve open. 

Drain a suitable volume of water from a drain point at the lowest part of the central
heating system. Ensure a sufficient amount of water is drained to allow space for the
volume of chemicals required. 

The IntaKlean has a large 500ml dosing capacity, which in most cases, should prove
sufficient. 

When the IntaKlean is empty, using an appropriate tool, remove the air vent from the
top of the collection vessel. 

Insert a funnel into the open aperture and dose the system accordingly. 

Re-commission the system as per the previous instructions in the COMMISSIONING
section.

Summary of Contents for IntaKlean Series

Page 1: ...ble We cannot accept any responsibility should it be found that in any respect the information is inaccurate or incomplete or becomes so as a result of further developments or otherwise Intatec Ltd Ai...

Page 2: ...t performance and filter protection however we recommend that the IntaKlean is installed on the return leg of the circuit between the last radiator and the boiler to gain the maximum advantage of the...

Page 3: ...r tied up When siting the IntaKlean ensure that the collection vessel is positioned to allow access and removal of the bottom cover withdrawl of the magnetic element and venting air Having removed the...

Page 4: ...sel and the cover at the bottom Hand tighten the valves to the collection vessel before fully tightening WARNING Over tightening the connection to the collection vessel can cause irreparable damage to...

Page 5: ...m CLEANING AND SERVICING Prior to cleaning the IntaKlean ensure that the working environment is safe Inta recommend that the boiler is switched off and that the system is allowed to cool to ambient te...

Page 6: ...amage replace if damaged Re assemble in the reverse order check joints for signs of leakage before recommissioning following the procedure in the COMMISSIONING section Magnetic Core Plastic Sheath O r...

Page 7: ...central heating system Ensure a sufficient amount of water is drained to allow space for the volume of chemicals required The IntaKlean has a large 500ml dosing capacity which in most cases should pro...

Page 8: ...012 Intatec Ltd Airfield Industrial Estate Hixon Staffordshire ST18 0PF Tel 01889 272 180 Fax 01889 272 181 email sales intatec co uk web www intatec co uk E O E 17 10 12 NOTES Please Leave this Manua...

Reviews: