© Intatec Ltd 2017
11
Plaster guard
• Check all joints for leakage before embedding into the wall or concealing the valve.
• Screw the extension pieces (20) into the two threaded holes.
• Place the thermostatic cartridge extension (21) over the flow cartridge spindle.
• Place the flow control cover (22) over the flow control valve and secure with the retaining
screw (24).
• Fit the plaster guard (23) over the valve and secure with two retaining screws (24).
• For a solid wall embed the pipes and shower valve with plaster.
• Finally finish the wall with plaster and plaster up to and around the plaster guard.
• When the plaster is dry remove the plaster guard or if a tiled wall leave in position and tile
around the guard.
• Finally remove the retaining screws, plaster guard and extension pieces.
20
21
22
23
24