© Intatec Ltd 2017
18
Commissioning
Important:
- The following instructions must be read and understood prior to commissioning the
thermostatic shower valve. If under any circumstances there are aspects to the installation /
system which do not comply with the specification laid down, the valve
MUST NOT
be put
into operation until the system / installation complies with the specification. However if all
these conditions are met, proceed to set the temperature as follows;
1. Ensure that the system is thoroughly cleaned and free from any debris prior to
commissioning the thermostatic shower valve.
2. Commissioning the temperatures must be carried out using a suitably calibrated
thermometer, preferably a digital thermometer. The sensing part of the thermometer probe
must be fully submerged in the water when testing.
3. The valve must be commissioned taking into consideration any fluctuations, which may
occur within the system due to simultaneous demands. It is advisable that any outlets which
are connected to the same supply as the shower valve are open during setting of the mixed
water temperature. It is advisable to ensure that the water temperatures are established
before any attempt to commission.
4. Once the supply temperatures are stable and the normal operating conditions are
established, the shower valve can be commissioned. The following sequence should be
followed when commissioning the valve;
4.1 The first step in commissioning a thermostatic shower valve is to check the following:
• The designation of the thermostatic shower valve matches the application
• The supply pressures are within the valve’s operating range.
• The supply temperatures are within the valve’s operating range.
• Isolating valves (and ‘Y’ strainers preferred) are provided.
4.2 If all these conditions are met, proceed to set the temperature following the procedure
described earlier in the Calibration section.
4.3 Measure and record the temperature of the hot and cold water supplies at the
connection to the valve.
4.4 Measure and record the temperature of the water discharging from the valve.
4.5 Isolate the cold water supply to the valve and monitor the mixed water temperature.
4.6 Measure and record the maximum mixed water temperature and the final temperature.
The final temperature found during the test should not exceed the values quoted.
4.7 Record all the equipment used during the commissioning.
4.8 The mixed water temperature at the terminal fitting must never exceed 2˚C above the
set temperature.
Summary of Contents for Nulo CB10032CP
Page 21: ...Intatec Ltd 2017 20 Notes...
Page 22: ...Intatec Ltd 2017 21 Notes...
Page 23: ...Intatec Ltd 2017 22 Notes...