Instruction Manual
|
7
T: 303-833-6644
www.inteccorp.com
Original Language - English
Set up and Operation
SYSTEM SET-UP:
INITIAL OPERATION
During initial operation, install the Fresh Air Inlet Kit for the VANGUARD Engine and Blower.
a.
Cut a 8” diameter hole into the side wall or floor of your truck / trailer. NOTE: be sure to
cut in a non-load bearing area.
b.
Mount the Outside Plate (on the outside of the truck) and Inside Plate (on the inside of the
truck) – sandwiching the wall or floor -- with four nuts.
c.
Hose Ring: The Hose Ring will mount to the Inside Plate.
Inside Plate
Outside Plate
The FORCE 5250’s agitation system is built strong to last. Using an
advanced design for rugged durability and superior product
conditioning. This design allows product to go through multiple stages
of conditioning prior to installation.
Main Agitator- fluted section allows for maximum mobility and
break-up of product.
Fluted section transitions to breaker bar section where rapid cycling
begins to transition product into smaller pieces.
Shredder Bars continue to pulverize product to proper conditioning.