Instruction Manual
|
6
T: 303-833-6644
or
800-666-1611
www.inteccorp.com
Original Language - English
System Operation:
1.
Energize System
a.
Plug in Power Cords. If you do not plan to run Blower #2 you can run system off of 2
power cords. In order to run both Blower(s) all 3 power cords will need to be utilized.
b.
4 Blue LED lights in lower right hand corner for Blower #1, Blower #2, Agitator and
Airlock should illuminate. If they do not, ensure that circuit breaker is not tripped. Reset
if needed by pushing the circuit breaker back in.
c.
Pull out the Emergency Stop Button
d.
Press the Power On button- Power On button ring and Variable Speed button ring will
illiminate.
Emergency Stop Button (Pull out to run, push in to stop)
Blower #1, Blower #2, Agitator and Airlock
LED Lights
And Circuit Breakers
Blower #2 Control Switch
Variable Speed Dial- Controls the speed of
Blower #1 when the Variable Speed
Button is in the “ON” setting
Remote Receptacle
L.R.T Antenna: shown in the transport
position (folded down). This Antenna is
hinged and during operations should point
straight out.