Intel® Server Chassis SC1400UP / Intel® Server Platform SR1425BK1-E
Revision 1.0
- 70 -
7.12 Modifications / Change Control
Following the qualification of the power supply, any changes in parts, materials, or processes
used in power supply manufacturer which affect form, fit, function, safety, reliability (Type One
changes), or documentation of the power
supplies delivered to Intel (Type Two changes) must be approved by Intel prior to the
incorporation of the changes.
Significant changes as determined by Intel, will require re-qualification of the power supply as
per Qualification Inspection/Test Procedure.
Intel reserves the right to negate Type One (form, fit, safety, function, or reliability) changes
within 30 days. All Type One changes must be submitted to Intel for review and must be
approved in writing.
Modification to certification records shall be provided to Intel upon completion.
7.13 Power Supply Compliance Overview
The power supply must comply with all regulatory requirements for its’ intended geographical
market. Depending on the chosen market, regulatory requirements may vary. Although a power
supply can be designed for worldwide compliance, there may be cost factors that drive different
versions of supplies for different geographically targeted markets.
7.14 Power Supplies Compliance Information
For Power Supply Vendor Certification Process refer to Section 5
Australia / New Zealand
AS/NZS 3562 (CB deviation)
Canada / USA
UL60 950 – CSA60 950
China (CNCA)
GB4943
Europe (CE) / Germany
EN60 950 – 73/23/EEC
International
IEC 60 950
Nordics
EMKO-TSE (74-SEC) 207/94 (CB deviation)
Notes:
Certifications shall be to the most recent accepted Edition of each standard.
The above certifications are the minimum requirements that enable end system products to
obtain International certifications. To support ALPHA or BETA development shipment of
engineering sample type shipments, other 3rd party certifications such as (NEMKO, CSA) are
acceptable.
Power Supply Vendor shall provide the following power supply certification documentation to
Intel. Documents should be provided electronically if possible.
UL Report & Approval Letter that covers UL Recognition for both USA & Canada Bauart
License (Germany)
CB Report & CB Certificate – CB Report must include all national deviations so power supply
report can be used in any CB member country. CB Report to also cover all EMKO-TSE (74-
SEC) 207/94