2. Rotate the left side of bezel outward slightly (see letter “B”).

3. Disengage the latches that attach the right side of the bezel to the chassis and remove 

(see letter “C”).

Figure 27.  Removing Bezel

Remove Lowest CD-ROM/DVD Drive Filler Panel

Remove the lowest CD-ROM/DVD/floppy drive or filler panel from chassis.

Note:Removal of CD-ROM drive shown.

Figure 28.  Removing Lowest Floppy/CD-ROM/DVD Drives or Filler Panel

TP02034

C

B

C

C

A

A

AF00566

Summary of Contents for SC5275-E BRP

Page 1: ...ver Chassis SC5275 E UP DP WS BRP Intel Entry Server Chassis SC5299 E DP WS BRP Intel Server Chassis SC5300 Intel Server Chassis SC5400 A Guide for Technically Qualified Assemblers of Intel Identified...

Page 2: ...ake changes to specifications and product descriptions at any time without notice Intel server boards contain a number of high density VLSI and power delivery components that need adequate airflow for...

Page 3: ...ntel com support motherboards server sb cs 010770 htm Consignes de s curit Lisez attention toutes les consignes de s curit et les mises en garde indiqu es dans ce document avant de suivre toute instru...

Page 4: ...ment damage can result Electrostatic discharge ESD and ESD protection ESD can damage disk drives boards and other parts We recommend that you perform all procedures in this chapter only at an ESD work...

Page 5: ...ier 7 Inserting LCP Carrier into Drive Bay of Server Chassis 7 Route LCP Cable 8 Connect LCP Cable to LCP Header of Server Board 9 Replace Bezel Assembly 10 Replace Access Cover 11 Installation Instru...

Page 6: ...Contents vi Local Control Panel Kit Install Guide Replace Bezel 24 Replace Access Cover 25...

Page 7: ...re 17 Removing Lowest Floppy CD ROM DVD Drives or Filler Panel 13 Figure 18 Installing EMI Shield on LCP Carrier 14 Figure 19 Installing Drive Rails to LCP Carrier 14 Figure 20 Inserting LCP Carrier i...

Page 8: ...List of Figures viii Local Control Panel Kit Install Guide...

Page 9: ...Before converting your system to a rack mount configuration observe these safety guidelines 1 Turn off all peripheral devices connected to the server 2 Turn off the server by pressing the power button...

Page 10: ...tions for the Intel Server Chassis SC5300 SC5400 If you are installing a Local Control Panel kit into an Intel Entry Server Chassis SC5275 E follow the instructions under Installation Instructions for...

Page 11: ...e than 40 degrees outward At a 40 degree angle push the bezel assembly away from the chassis see letter C If the bezel assembly does not immediately disconnect from the chassis then tap the left hand...

Page 12: ...he inner bezel door use your other hand to push the outer bezel door away from the inner bezel door The outer bezel door will disengage from the inner bezel door at the four hinges see letter A in the...

Page 13: ...ve Upper Third of Bezel Grill Remove the upper one third of the bezel grill by pushing grill forward Figure 4 Removing Upper One third of Bezel Grill Install LCP Grill Install new LCP grill into outer...

Page 14: ...Control Panel Kit Install Guide Remove Lowest CD ROM DVD Drive Filler Panel Remove the lowest CD ROM DVD Floppy drive or filler panel from chassis Note Removal of CD ROM drive shown Figure 6 Removing...

Page 15: ...o be installed Install the EMI shield by aligning the middle tooth see letter A in the following figure with the indentation in the side of the LCP carrier Figure 7 Installing EMI Shield on LCP Carrie...

Page 16: ...sure that the drive rails are using the correct slots in the chassis Figure 9 Installing LCP Carrier Route LCP Cable Route the LCP cable under the chassis fan area along side the floppy and IDE cables...

Page 17: ...tall Guide 9 Connect LCP Cable to LCP Header of Server Board 1 Connect the LCP cable to the LCP header on the server board 2 For an Intel Server Board SE7520AF2 use header J1J1 on the server board Fig...

Page 18: ...ezel Assembly Fit the right hand side of the inner bezel door against the right hand side of chassis and engage plastic bezel hooks see letter A in the following figure into raised metal slots at chas...

Page 19: ...than a 40 degree angle or you may damage the bezel hooks at the right hand side of the door Figure 13 Installing Inner Bezel Door Replace Access Cover Replace access cover and slide forward to secure...

Page 20: ...g a Local Control Panel kit into an Intel Entry Server Chassis SC5299 E follow the instructions under Installation Instructions for Intel Entry Server Chassis SC5299 E on page 19 Remove Access Cover W...

Page 21: ...2 Rotate the left side of bezel outward slightly see letter B 3 Disengage the latches that attach the right side of the bezel to the chassis and remove see letter C Figure 16 Removing Bezel Remove Lo...

Page 22: ...g the middle tooth see letter A in the following figure with the indentation in the side of the LCP carrier Figure 18 Installing EMI Shield on LCP Carrier Inserting LCP Carrier into Drive Bay of Serve...

Page 23: ...in drive bay and secure with two screws to the front of chassis Figure 20 Inserting LCP Carrier into Drive Bay Route LCP Cable Route the LCP cable to the corner of the server board where the LCP heade...

Page 24: ...Install Guide Connect LCP Cable to LCP Header on Server Board 1 Connect the LCP cable to the LCP header on the server board 2 For an Intel Server Board SE7520AF2 use header J1J1 on the server board Fi...

Page 25: ...Cable to Header on Intel Server Board SE7520BD2 Replace Bezel 1 If necessary remove filler panel from bezel that corresponds to the position of the LCP carrier 2 Engage the three clips see letter A in...

Page 26: ...Installing Bezel Replace Access Cover To replace the access cover 1 Position access cover on chassis see letter A in the following figure 2 Slide the two thumb latches see letter B to the CLOSED posit...

Page 27: ...ard SC5275 E follow the instructions in Installation Instructions for Intel Entry Server Chassis SC5275 E on page 12 Remove Access Cover When your chassis is upright in a tower pedestal position and y...

Page 28: ...e the latches that attach the right side of the bezel to the chassis and remove see letter C Figure 27 Removing Bezel Remove Lowest CD ROM DVD Drive Filler Panel Remove the lowest CD ROM DVD floppy dr...

Page 29: ...EMI Shield onto LCP Carrier Your backplane board shipped with an EMI shield that has to be installed Install the EMI shield by aligning the middle tooth see letter A in the following figure with the i...

Page 30: ...CP carrier into the desired 5 25 in drive bay Feed the cable in first Figure 30 Inserting LCP Carrier into Drive Bay Route LCP Cable Route the LCP cable to the corner of the server board where the LCP...

Page 31: ...on the server board 2 For an Intel Server Board S5000VSA use header J1J6 on the server board Figure 32 Attaching LCP Cable to Header on Intel Server Board S5000VSA 3 For an Intel Server Board S5000PSL...

Page 32: ...hree clips see letter A in the following figure at the right edge of the bezel with the corresponding latches on the right side of the chassis 3 Engage the clips with the slots see letter B 4 Rotate t...

Page 33: ...o replace the access cover 1 Slide the access cover on the chassis and latch securely see letter A in the following figure 2 optional Replace shipping screws see letter B Caution This chassis must be...