Hardware Installations and Upgrades
46
Intel® Entry Server Chassis SC5299-E DP/WS/BRP User Guide
8. Rotate the blue locking mechanism to the locked position (see letter “A” in the
following figure).
Figure 57. Locking Fixed Power Supply into Chassis
9. Route and connect the P1, P2, and P14 cables to the server board. Refer to the Intel
®
Server Board
Quick Start User’s Guide
or
User Guide
that came with your Intel
®
server board for appropriate power connections.
10. Route the P5 cable to the floppy drive.
11. Route the P3 and P4 cables to the 5.25-in. removable media device bays and connect
to installed devices.
12. Route the P8, P9, P10, and P12 cables to the hard drive cage and connect power
cables to installed devices.
13. Install the left side cover. For instructions, see
“Installing the Left Side Cover”
.
14. Reconnect all peripheral devices and the AC power cable to the server. Power up the
server.
TP01755
A
Summary of Contents for SC5299-E BRP
Page 8: ...Preface viii Intel Entry Server Chassis SC5299 E DP WS BRP User Guide...
Page 16: ...xvi Intel Entry Server Chassis SC5299 E DP WS BRP User Guide...
Page 18: ...xviii Intel Entry Server Chassis SC5299 E DP WS BRP User Guide...
Page 108: ...Technical Reference 90 Intel Entry Server Chassis SC5299 E DP WS BRP User Guide...
Page 133: ...Safety Information Intel Entry Server Chassis SC5299 E DP WS BRP User Guide 115 ITE ITE 5V...
Page 134: ...Safety Information 116 Intel Entry Server Chassis SC5299 E DP WS BRP User Guide...
Page 136: ...Safety Information 118 Intel Entry Server Chassis SC5299 E DP WS BRP User Guide...
Page 152: ...Getting Help 134 Intel Entry Server Chassis SC5299 E DP WS BRP User Guide...
Page 160: ...Warranty 142 Intel Entry Server Chassis SC5299 E DP WS BRP User Guide...