Hardware Installations and Upgrades
52
Intel® Entry Server Chassis SC5299-E DP/WS/BRP User Guide
11. Insert new hot swap power supply cage into chassis. Secure back of hot swap power
supply cage to chassis with five screws.
Note: Ensure that you route the power supply cables through the power supply opening in the
chassis first before inserting the power supply cage.
Figure 67. Securing Hot Swap Power Supply Cage to Rear of Chassis
12. Secure inside panel of hot swap power supply cage to chassis with two screws.
Figure 68. Securing Hot Swap Power Supply Cage to Inside of Chassis
TP01766
TP01767
Summary of Contents for SC5299-E BRP
Page 8: ...Preface viii Intel Entry Server Chassis SC5299 E DP WS BRP User Guide...
Page 16: ...xvi Intel Entry Server Chassis SC5299 E DP WS BRP User Guide...
Page 18: ...xviii Intel Entry Server Chassis SC5299 E DP WS BRP User Guide...
Page 108: ...Technical Reference 90 Intel Entry Server Chassis SC5299 E DP WS BRP User Guide...
Page 133: ...Safety Information Intel Entry Server Chassis SC5299 E DP WS BRP User Guide 115 ITE ITE 5V...
Page 134: ...Safety Information 116 Intel Entry Server Chassis SC5299 E DP WS BRP User Guide...
Page 136: ...Safety Information 118 Intel Entry Server Chassis SC5299 E DP WS BRP User Guide...
Page 152: ...Getting Help 134 Intel Entry Server Chassis SC5299 E DP WS BRP User Guide...
Page 160: ...Warranty 142 Intel Entry Server Chassis SC5299 E DP WS BRP User Guide...