I/O Controller Hub
9.7.5
Terminating Unused Connections
In Ethernet designs, it is common practice to terminate unused connections on the RJ45 connector
and the magnetics module to ground. Depending on overall shielding and grounding design, this
may be done to the chassis ground, signal ground, or a termination plane. Care must be taken when
using various grounding methods to insure that emission requirements are met. The method most
often implemented is called the “Bob Smith” Termination. In this method, a floating termination
plane is cut out of a power plane layer. This floating plane acts as a plate of a capacitor with an
adjacent ground plane, and couples capacitively to the ground plane creating the required 1500 pF
of capacitance. The signals can be routed through 75
Ω
resistors to the plane. Stray energy on
unused pins is then carried to the plane.
Termination Plane Capacitance
It is recommended that the termination plane capacitance equal a minimum value of 1500 pF. This
helps reduce the amount of crosstalk on the differential pairs (TDP/TDN and RDP/RDN) from the
unused pairs of the RJ45. Pads may be placed for an additional capacitance to chassis ground,
which may be required if the termplane capacitance is not large enough to pass EFT (Electrical
Fast Transient) testing. If a discrete capacitor is used to meet the EFT requirements, it should be
rated for at least 1000 Vac.
Figure 9-21. Termination Plane
N/C
RJ45
Magnetics module
RDP
RDN
TDP
TDN
Termination plane
Additional capacitance that may be
required for EFT testing
Summary of Contents for Xeon
Page 24: ...Introduction 24 Design Guide This page is intentionally left blank ...
Page 30: ...Component Quadrant Layout 30 Design Guide This page is intentionally left blank ...
Page 52: ...Platform Clock Routing Guidelines 52 Design Guide This page is intentionally left blank ...
Page 66: ...System Bus Routing Guidelines 66 Design Guide This page is intentionally left blank ...
Page 118: ...Intel 82870P2 P64H2 118 Design Guide This page is intentionally left blank ...
Page 146: ...I O Controller Hub 146 Design Guide This page is intentionally left blank ...
Page 148: ...Debug Port 148 Design Guide This page is intentionally left blank ...
Page 210: ...Schematic Checklist 210 Design Guide This page is intentionally left blank ...
Page 220: ...Layout Checklist 220 Design Guide This page is intentionally left blank ...
Page 222: ...Schematics 222 Design Guide This page is intentionally left blank ...