background image

10 

 

 

3.

  INSTALLATION 

 

ATTENTION:  InTenda  S.r.l.  recommends  a  preventive  investigation  by  a  competent 
technician,  for  a  detailed  analysis  of  the  urban  planning  regulations  in  force  in  the 
installation area of the box. The manufacturer assumes no responsibility for installations 
in areas (floors) not suitable for supporting the static and dynamic loads of the structure or 
in areas where the stresses deriving from atmospheric phenomena can cause permanent 
damage  to  the  structure.  The  manufacturer  assumes  no responsibility for  installations  in 
areas regulated by specific urban planning regulations. 

 

3.1. Handling and transport 

 

 

The box installation should only be done by qualified staff. 
The products must be unloaded through appropriate lifting equipment, which must be used only by 
authorized staff.  
If the unloading operation is made by hand, it is important to consider that the weight limit that each 
male  person  can  handle  is  25  kg;  moreover,  the  operators  should  be  equipped  with  gloves  and 
safety shoes. 
 

3.2. Place and requirements for the installation 

 

Before the arrival of the installers the user must arrange:  

  any permits required by local regulations  

  appropriate ground 

 

3.3. Installation 

 

Before starting the installation, if electrical equipment utilization is needed:  

  make sure you do not work in wet areas  

  use only intact extension cords, according to the place of use  

  use shoes with rubber soles 

 

ATTENTION:

  It  is  necessary  for  the  operators  to  use  appropriate  personal  protective 

equipment  such  as  safety  shoes  and  gloves,  in  order  to  avoid  injuries  provoked  by  the 
fall  of  the  packaging  or  of  components  that  it  contains,  perforation  and  cutting  due  to 
cutting or hanging parts 

 

3.3.1. Package opening 

 

Packaging must be opened only with scissors with rounded tips, using the best care not to damage 
the cloth of the product

 

(Photo 1). 

 

Summary of Contents for KIT BOX SERRA

Page 1: ...INSTALLATION USE AND MAINTENANCE KIT BOX SERRA INTENDA S r l Via V Pareto 3 37045 S Pietro di Legnago VR Tel 39 0442 601031 600270 Fax 39 0442 25164 http www intenda it e mail info intenda it...

Page 2: ...BOX DESCRIPTION AND TECHNICAL SHEET 6 2 1 General description 6 2 2 Components 7 2 3 Fabric s characteristics 9 3 INSTALLATION 10 3 1 Handling and transport 10 3 2 Place and requirements for the insta...

Page 3: ...ranslations into other languages which do not conform to the original meaning This manual reflects the state of the product at the time of supply and cannot be considered inadequate only because it is...

Page 4: ...have been properly eliminated Make sure that all the guards and other protections as well as the structural fixings are in place and that all the safety devices are present and efficient Make sure tha...

Page 5: ...nufacturer as a means of product identification For no reason the data shown on the product can be altered A reproduction of the plate is shown in the following drawing Notes contain important informa...

Page 6: ...ilding process INTENDA S r l uses materials and mechanisms of suitable type state and quality at its own discretion even after the receipt of the order INTENDA S r l can make substantial changes or ap...

Page 7: ...th joints 2 VINITEX TARPAULINS 3 VINITEX PVC GABLE END 4 PVC SLIDING CURTAIN 5 ALUMINIUM CROSSBEAM 6 NYLON ROUND BUTTON 7 ELASTIC ROPE 8 GROUND FIXING BRACKETS 9 CROSSES CM 160X160 10 BARS FOR TIGHTEN...

Page 8: ...8...

Page 9: ...arp 2 yarns cm Weft 2 yarns cm Thickness 0 46 mm Weight ca 350 g m2 ISO 2286 2 Finishing translucent PVC film with polyester support Breaking Strength Warp ca 90 DaN 5 cm EN ISO 1421 Weft ca 75 DaN 5...

Page 10: ...ration is made by hand it is important to consider that the weight limit that each male person can handle is 25 kg moreover the operators should be equipped with gloves and safety shoes 3 2 Place and...

Page 11: ...xisting environmental norms 3 3 2 Box installation The box should be installed according to the following instructions The uprights must be lifted up an opened up slightly photo 3 Put the two arches w...

Page 12: ...e other profiles photo 6 7 8 9 Now insert the top covers in the profiles like demonstrated in photos 10 to 19 In order to facilitate this procedure it is advised to spray lubricant into the grooves ph...

Page 13: ...13 PHOTO 12 PHOTO 13 PHOTO 17 PHOTO 16 PHOTO 19 PHOTO 14 PHOTO 15 PHOTO 18...

Page 14: ...edure for all top covers The top covers must be fixed with screws to the lower part of the structure photo 21 22 Proceed to the installation of the two sliding curtains photo 23 24 25 PHOTO 18 PHOTO 2...

Page 15: ...30 NOTICE for the Base Version the two supplied ratchets must be used for tensioning the crosses photo 28 29 30 for the Mobile Version ratchets are already installed on every cross The number of the r...

Page 16: ...le module at both sides stop the plates placed at the bottom part of the crosses using the matching screws photo 31 and 32 PHOTO 30 PHOTO 29 PHOTO 28 PHOTO 31 PHOTO 32 PHOTO 27 PHOTO 26 PHOTO 28 PHOTO...

Page 17: ...und i twill be possible to measure the Box length and to cut the metal bar in the same length as the Box length Then make a hole where the bar must be fixed to the arch In the end the bar must be fast...

Page 18: ...d in this manual It is useful to explain the correct meaning of some terms used it this manual Dangerous areas any part of the box which can damage a person during handling of the structure Exposed pe...

Page 19: ...between the crosses in horizontal position Link the internal stretching devices to the pegs with eyelet placed on the ground then put in tension the structure through the stretching device The structu...

Page 20: ...evere maintenance deficiencies in case of unauthorized modifications of the product with total or partial non compliance with the instructions It is not possible to use the box in conditions of strong...

Page 21: ...es Ordinary maintenance checks and lubrification operations must be done after the frame has been uninstalled ATTENTION Every modification or manomission which has not been previously authorized by th...

Page 22: ...EVERY 24 MONTHS General inspection of the constructor with report of the most stressed components 7 DISASSEMBLY Disassembling operations are done backward to the assembly The eventual disposal of the...

Reviews: