background image

POWER DISTRIBUTOR

6

PD-6359

Front Panel

Front Panel 

1. AC VOLT METER

It displays the AC power voltage.

2. DC VOLT METER

It displays the internal DC power voltage.

3. AC LED

When it is on, means that the device operation and power supplying status is AC power.

4. DC LED

When it is on, means that operation power is switched to DC power (Battery) due to AC power black out.

5. SWITCHED LED

It is the LED displaying the status of switched power. when it is on, The power is being supplied. 

6. POWER LED

It will be on when power switch is pushed and device is operated remotely.

7. POWER SWITCH

It is the switch which controls AC/DC power output of rear panel, and the power is supplied when it is ON.

1

2

3

4

5

6

7

Summary of Contents for PD-6359

Page 1: ...Operation Manual Power Distributor PD 6359 Rack mount products in the Western Hemisphere North America South America and the Caribbean do not have handles installed due to customer preference...

Page 2: ...ord The socket outlet shall be installed near the equipment and shall be easily accessible Caution These servicing instructions are for use by qualified service personnel only To reduce the risk of el...

Page 3: ...ent 2 Important Safety Instructions 2 Features 3 Caution when Assembling Racks 3 Equipment Setting and Checking 4 Front Panel 6 Rear Panel 7 Applications 10 Block Diagram 11 Specifications 12 Service...

Page 4: ...her apparatus including amplifiers that produce heat 9 Do not defeat the safety purpose of the polarized or grounding type plug A polarized plug has two blades with one wider than the other A groundin...

Page 5: ...L Power can be on off from Windows program and it can be controlled through the contact of remote terminal without PC AC DC VOLT METER The status of service voltage can be monitored through front LED...

Page 6: ...mber Ex when number 1 and 3 is ON 1 and 4 is added so equipment number will be 5 2 TERMINATION Switch LOAD OPEN Setting 1 For the system linked by using RS 485 communication interface it is necessary...

Page 7: ...vice 2 Remove the AC power cord then check the operation status with battery power in case of black out To prepare the black out the battery and battery charger PB 6207 is required 3 Check on off cont...

Page 8: ...power 4 DC LED When it is on means that operation power is switched to DC power Battery due to AC power black out 5 SWITCHED LED It is the LED displaying the status of switched power when it is on Th...

Page 9: ...e is operated remotely When POWER ON it will be on by orders of AC SWITCHED 3 AC SWITCHED 2 AC SWITCHED 1 for 2 seconds interval and if power is off it will be off in reverse orders 2 AC OUTLET UNSWIT...

Page 10: ...ctly 6 AC FUSE It is the fuse for AC power and if error occurs in the device it shuts off the AC power to protect the device If you want to replace the fuse please use the one which rated capacity is...

Page 11: ...ATTERY POWER INPUT TERMINAL It is the terminal which connects the emergency power to use the system in case of black out and It normally connects to the battery Caution to polarities when it connects...

Page 12: ...POWER DISTRIBUTOR Applications Applications 10 PD 6359...

Page 13: ...POWER DISTRIBUTOR 11 PD 6359 Block Diagram Block Diagram...

Page 14: ...ion Temperature 10 C 40 C Power Source 100 120VAC or 220 240VAC 50 60Hz Supplied AC mains transformer depends on country requirements Power Consumption 220W Weight SET Europe U S A 10 5kg 23 1lb Saudi...

Page 15: ...e by contacting your warranty provider Variations and Options Variations and Options Variations Products supplied through legitimate sources are compatible with local AC power requirements Options No...

Page 16: ...any but rather a global company that is truly international in scope with factories and offices in Korea and China and sales and marketing operations located in Japan Europe and the U S A With more th...

Reviews: