background image

GA-160 Operation & Maintenance Manual 

Page 8 of 8

Summary of Contents for GA-160

Page 1: ...ginal factory container the purchaser shall within 10 calendar days deliver notice of the defect or shortage Damaged freight claims must be placed with the freight carrier and will not be honored by the factory If after due investigation of a claim of defect or shortage is found valid the factory at it s sole discretion may discharge it s entire obligations to the purchaser by either repair or rep...

Page 2: ...ION PAGE 1 1 Mounting 3 1 2 Connections 3 1 3 Start up 3 2 0 MAINTAINENCE 2 1 Routine Maintenance 3 2 2 Recommended Spare Parts 3 2 3 Troubleshooting 4 3 0 DRAWINGS ENCLOSED 3 1 General Arrangement Drawing 5 3 2 Exploded View Bill of Materials 6 3 3 Exploded view 4 way Cycling Valve 7 3 4 Pneumatic Schematic 8 ...

Page 3: ... the external air regulator backed out all the way slowly increase the pressure by turning the regulator knob clockwise The pump will start to cycle building pressure of destination media as it does so The pump will stall when circuit pressure reaches the sum of the regulated drive pressure and the inlet media pressure The pump will maintain this pressure even if there is some circuit leakage At t...

Page 4: ...ect Reconnect air supply Re sets air spool to end position Disassemble air valve assembly Inspect for contamination or mechanical bind Repair or replace lubricate seals with water proof grease Pump makes one cycle then stops Faulty item 24 2 way air valve Broken leaks or contaminated Repair or replace Pump cycles constantly when dead headed External leak at pump or downstream high pressure circuit...

Page 5: ...GA 160 Operation Maintenance Manual Page 5 of 8 ...

Page 6: ...GA 160 Operation Maintenance Manual Page 6 of 8 ...

Page 7: ...GA 160 Operation Maintenance Manual Page 7 of 8 ...

Page 8: ...GA 160 Operation Maintenance Manual Page 8 of 8 ...

Reviews: