background image

Save This Manual for Future Reference

501 01 1504 00

11/13/01

3 PHASE 6.3 to 10 TON

AC CONDENSERS

SPLIT SYSTEM

Installation

Instructions

Summary of Contents for CAC075

Page 1: ...Save This Manual for Future Reference 501 01 1504 00 11 13 01 3 PHASE 6 3 to 10 TON AC CONDENSERS SPLIT SYSTEM Installation Instructions...

Page 2: ...ughly for hidden damage If damage is found notify the transportation company im mediately and file a concealed damage claim CAUTION Improper installation adjustment alteration service or maintenance c...

Page 3: ...d with 18 inches 45cm between units A service clearance of 24 inches 60cm is desirable from control box end or side Control box and corner panel be low it can be loosened and moved out to the side to...

Page 4: ...learances Figure 2 Full Wall Recommended Clearances 24 6 24 24 Full Wall Minimum Clearances 24 6 18 18 18 Full Wall Minimum Clearances 6 24 24 18 6 24 24 6 24 Full Wall Minimum Clearances 24 6 18 18 H...

Page 5: ...enings should be made large enough to allow for a sound absorbing material to be placed or installed between the tubing and the foundation This will prevent noise transmission between the tubing and t...

Page 6: ...e stem and the second has a rolled top and also has finer threads on the valve cap NOTE You may encounter more than one type of valve on a unit For service valves fully insert a hex wrench into the st...

Page 7: ...accordance with the National Electrical Code and local codes or ordinances Use a cop per conductor of the correct size from the grounding termi nal in control box to a grounded connection in the servi...

Page 8: ...e should be clamped securely to the liquid line on a horizontal plane between 9 3 O clock and insulated Record the liquid line temperature 2 Measure and record the liquid line refrigeration pres sure...

Page 9: ...eep the outdoor coil clean and free of restrictions Keep fences shrubs snow drifts and any other obstructions at least two feet from all coil air inlets 2 Keep the coil free of grass clippings weeds a...

Page 10: ...oil nozzles refrigerant refrigerant inspection and refrigerantreclaiming freight and or handling charges associated with any repair or replacement and such charges will be your responsibility To esta...

Page 11: ...Units HAC0 HAC2 HAC4 CAC0 CAC2 CAC4 KAC0 TCA0 TCA2 TCA4 HHP0 HHP2 HHP4 CHP0 CHP2 CHP4 TCH0 TCH2 TCH4 PGME PYMC PGK GPK PHAD PGAD PA95 PAPC PAK APK To the originalpurchaser a replacement for 10 years f...

Reviews: