Section 1, Overview
International Thermal Research
1-7
•
Overflow tank to connect to the Hurricane
®
Chinook with clear
plastic 1/2" hose; tank must be made of heavy-duty plastic,
vented with a screw-down cap, have an overflow outlet, and
sturdy enough to mount firmly to a vertical surface.
•
Up to five (5) thermostats (DC compatible) to allow temperature
regulation of the heating zones.
1.6 Testing and Inspection
After all components have been properly installed according to
standard practices, ABYC A-7 standards and the recommendations
of this Installation and Operating Manual, the Hurricane
®
Chinook
Heating System should be test-operated for inspection purposes.
For your convenience, you can use the pullout
Inspection Check
Sheet
in this Manual. The Inspection Check Sheet is divided into
progressive sections, allowing each phase of the inspection to be
carried out systematically, and then signed off by authorized
persons.