5
Installation
5.12
Establishing the
mains connection
74
INTILION GmbH
Illustration 38: Ethernet ports for connecting the energy meter and the battery storage
system
Either the previous battery storage system or the energy meter (in the event of the Master) is
connected to port -XF14. The next battery storage system is connected to port -XF15.