10 Decommissioning and disassembly
10.2 Disassembly
INTILION scalebloc
113
10.2.2.9 Preparing the battery storage system for loading
•
Remove the fastenings securing the battery storage system onto the foundation.
•
Follow these steps in reverse order to secure the floor plates.
•
Insert the side panels and push them backwards to the back of the battery storage
system.
•
Secure the side panels using the previously removed screws.
Illustration 80: Securing the front panel
•
Insert the front panel and push it as far as it will go (approx. 10 mm) in the direction of
the arrow.
•
Secure the front panel using the previously removed screws (1).
•
Close the doors of the battery storage system.
To this end, start by lifting up the respective latching hook.