INDUSTRIAL SHREDDER
Instruction manual for use and maintenance
MSM0005EN_
F
56 / 90
5.
SETTING AND FIRST STARTING
5.1
PREPARATION, INSPECTIONS AND TESTS BEFORE START-UP.
Before starting work, carry out a first no-load running of the machine. Furthermore, proceed with the
following controls:
5.1.1
Grid holder (if installed) or rotating screen (if installed)
CAUTION
Before starting the shredder always check that the bolts which secure the grid-
holder to the shredding chamber are perfectly tightened.
WARNING
Before starting the shredder, always check if the bolts that secure and close the
rotating screen to the shredding body are properly tighten.
5.1.2
Motor
Check that the motor is wired in accordance with the mains voltage. Specifically, check that the wirings
inside the clamp box have been properly carried out according to the specifications given on the motor
rating plate.
5.1.3
Transformer
Check that the transformer inside the switchboard is properly connected, in accordance with the mains
voltage.
5.1.4
Thermal relay
Adjust the relay in accordance with the maximum current indicated on the motor rating plate.