9
After following all the steps in General Operation proceed with the following.
1.
Insert the battery box with the external power connection towards the front
of the chair.
2.
There are two batteries. Attach the wiring loom to each battery making sure
that the correct polarity is observed. Correct wiring is illustrated by a
placard, fixed in the battery box lid. Lift each battery with the lifting harness
attached into position,
connect the power cables to the appropriate
plugs and ensure that the power cables are clear of obstacles when
replacing the battery box lid. Tighten the battery box securing strap.
3.
Slide the power control module into the mounting bracket under the armrest
and secure it into position. Your control module can be mounted either on
the left or right hand side of the chair. Should you wish to change the
mounting of the power module, your selling Dealer can assist as Fig 23
shows.
4.
Ensure that all the power connections are correctly fitted.
Fig 23
Foldable frame, various quick
Release
construction.
Summary of Contents for Hydra C650PW
Page 29: ...29 ...
Page 34: ...7 7 Electromagnetic Compatibility EMC 48 7 8 Contact Details 49 ...
Page 36: ...GBK80260 Issue 1 1 07 2004 2 THIS PAGE IS LEFT BLANK INTENTIONALLY ...
Page 48: ...GBK80260 Issue 1 1 07 2004 14 THIS PAGE IS LEFT BLANK INTENTIONALLY ...
Page 64: ...GBK80260 Issue 1 1 07 2004 30 THIS PAGE IS LEFT BLANK INTENTIONALLY ...
Page 66: ...GBK80260 Issue 1 1 07 2004 32 THIS PAGE IS LEFT BLANK INTENTIONALLY ...
Page 71: ...Chapter 7 Appendices 37 Dynamic SHARK Looms For DK REMA DK PMA Power Module ...
Page 84: ...Installation Manual DK PMA SHARK Power Module by GBK80262 Issue 1 June 2004 ...
Page 87: ......
Page 89: ...GBK80262 Issue 1 1 07 2004 2 THIS PAGE IS LEFT BLANK INTENTIONALLY ...
Page 91: ...GBK80262 Issue 1 1 07 2004 4 THIS PAGE IS LEFT BLANK INTENTIONALLY ...
Page 113: ...GBK80262 Issue 1 1 07 2004 26 Dynamic SHARK DK PMA Looms ...
Page 116: ...Chapter 7 Appendices 29 Dynamic SHARK Connector Kits and Adapters ...