27
2.7.5
Completing Installation
Step 1: Place the chassis in the cabinet.
Step 2: According to the required depth position, the hole is locked on the fixing
bracket of the cabinet (There are two screws on the left and right, which
need to be in the same position).
Step 3: Tighten the flat head screw(I) to secure the mounting bracket (G-1) to the
cabinet.
* For more detailed dynamic installation instructions, see the RJ472 Rail CMA -
Assembly Live Video File. (Link)
2.7.6
Insert the Chassis to the Cabinet External Cable Management Arm Installation
Step 1: Pull out the middle rail to the stop position.
Step 2: Move the ball bearing retainer to the front end of the middle rail, it should
click into the locked position.
Summary of Contents for IW-RJ472-05
Page 1: ...IW RJ472 05 User s Manual...
Page 7: ...4 1 Product Introduction 1 1 Box Contents...
Page 21: ...18 Step 2 Step 3 Connects the Cables Connects the Cables...
Page 40: ...37...