Machine Operation
22
Zero™ Operation
(Vehicle Mounted Machines)
Pure Water Production
After suitable water and electric connections have been made, pure water production, filter
flushing and regeneration are all automatic functions of the machine. The following step-by-
step guide and explanation of the sequence of events are all that the operator needs to know
about the operation of the machine. For any servicing or repairs other than routine filter
replacement please refer to Ionic Systems Ltd or an approved agent of Ionic Systems Ltd.
Step 1
Connect a suitable water supply to the mains water ‘IN’ connection and ensure that the water
supply is fully open, please refer to page 25.
Step 2
Connect a suitable hose to the ‘Reject’ water
connection to run reject water to a suitable
drain.
1: Mains Water In
2: Reject Water Out
Step 3
Connect a suitable mains electric supply, please refer to page 18.
Step 4
Only after steps 1 through 4 have been completed, press the green ‘START’ button on
the control panel.
Summary of Contents for Zero PPB
Page 1: ...1 Operators Manual...
Page 5: ...Zero Weights Dimensions 5 Dimensions...
Page 7: ...Machine Component Identification 7 Component Identification...
Page 8: ...Machine Component Identification 8 Control Panel...
Page 10: ...Machine Component Identification 10 Zero System Filters Removed...
Page 13: ...Machine Component Identification 13 Filter Identification Zero PPB System...