2
emu3/emu3ACO Operation Guide
Version 2.1
Copyright
Copyright
01 October 2018
Copyright © 2011–2018 IPE Ltd
Independent Project Engineering Limited (IPE Ltd) reserves the right to make changes to the specifications of the products detailed
in this document at any time without notice and obligation to notify any person of such changes.
All third-party trademarks are acknowledged and observed. Mention of third-party products does not constitute an endorsement
or a recommendation.
All figures, data and specifications contained in this document are typical and must be specifically confirmed in writing by IPE Ltd
before they apply to any tender, order or contract. IPE Ltd takes every precaution to ensure that all information contained in this
publication is factually correct but accepts no liability for any error or omission. No freedom to use patents or other property rights
is implied by this document.
IPE
Saxon Way
Melbourn
Royston
Herts.
SG8 6DN
tel: +44 (0)1763 269066
email: sales@ipe-technologies.com
web: www.ipe-technologies.com
IPE Ltd warrants that the Products described in this guide shall conform to their published specification in all material respects for a
period of 12 months from the Delivery Date (“the Warranty Period”). In the event that there is a failure to conform with its published
specification during the Warranty Period, IPE Ltd shall, at its option, repair, modify, or supply a replacement for the defective part.
IPE Ltd shall bear its own costs of all such warranty work.
All the above warranties are contingent upon proper use of the Product. These warranties will not apply (i) if adjustment, repair,
or replacement is required because of accident, unusual physical, electrical or electromagnetic stress, neglect, misuse, failure of
electric power, environmental controls, transportation, failure to be maintained properly or otherwise in accordance with the
specifications, or abuses other than ordinary use; (ii) if the Product has been modified by end user or has been repaired or altered
outside IPE Ltd’s repair facility, unless IPE Ltd specifically authorizes such repairs or alterations in each instance.