3
Before You Start
•
Before you get started with your installation, ensure you have done the following items first:
Mark Your Fence Layout
•
In preparation for installation and for permit approval purposes (if required), you will want to mark the
outline of where the fence will be installed. This can be done with a string line, marking spray paint or
flags. If you are installing over or on concrete, you can mark the outline with chalk.
Obtain a Fence Permit (if Required)
•
Call your local Building/ Engineering Department and ask if a permit needs to be obtained. Obtaining a
fence permit typically requires filling out a form, paying a small fee and having a local inspector take a look
at where your fence is going to be installed based on your marked layout.
Have Your Utilities Marked
•
Even if you are not required to obtain a fence permit, call to have your utilities marked. It is important to
know what’s buried below before you begin digging post holes. Simply dial ‘811’ and they will get you in
contact with your local utility provider to come out and mark any buried lines at no charge. They will
typically come out within 24-48 hours and will mark any buried utilities with flags or spray paint. You can
visit
www.call811.com
for more info on how the process works.
Gather the Required Tools
To install your Stronghold Iron® fence, you will typically need the following tools:
•
String Line
•
Shovel and Post Hole Digger (manual or powered) for Post Holes
•
Tub, Wheelbarrow or Powered Mixer for Concrete
•
Measuring Tape
•
Level
•
Rubber Mallet and Regular Hammer
•
Hacksaw or Sawzall for trimming panels (if necessary)
•
High Speed and Quality Drill or Power Driver
•
Center Punch
•
Socket and/or wrench set for installing supplied gate hardware
•
Caulk Gun