Tool:
N-7 Box Spanner
1PCS
Hardware:
N-8 Flat Washer
˜
8*
˜
19*2T
4PC
N-3 Nut for M8 Bolt
4PCS
2.1 Front Stabilizer Installation.
Lift up the Main Frame (G-12) towards the front, and then align the Front
Stabilizer (J-1) onto the front curve of the Main Frame (G-12). Attach two
Carriage Bolts (N-4) and on the other ends of bolts with two Washers (N-8) and
two Nuts (N-3). Hold the Front Stabilizer (J-1) to the Main Frame (G-12) and
use the Box Spanner to tighten the Nuts (N-3) until firm and secure.
2.2 Rear Stabilizer Installation.
Lift up the Main Frame (G-12) towards to the end, and then align the Rear
Stabilizer (I-3) onto the rear curve of the Main Frame (G-12). Attach Two
Carriage Bolts (N-4) and on the other ends of bolts with two Washers (N-8) and
two Nuts (N-3). Hold the Rear Stabilizer (I-3) to the Main Frame (G-12) and
use the Box Spanner to tighten the Nuts (N-3) until secure
2.Front and Rear Stabilizer Installation
N-4 Carriage Bolt
M8*P1.25*60mm
4PC
ASSEMBLY
12
12
Summary of Contents for H-Class 310
Page 2: ...6100 1 090314 2 ...
Page 5: ...LABEL PLACEMENT 5 ...
Page 7: ...OVERVIEW DRAWING A 7 ...
Page 26: ...55 75 90 100 COMPUTER 26 ...