CONTeNTS
GROUND MOUNT INSTALLATION MANUAL - 1
© 2019 IRONRIDGE, INC. VERSION 2.8
10
10
10
SYSTeMS USING eNPHASe MICROINVeRTeRS OR SUNPOWeR AC MODULeS
SYSTeMS USING MICROSTORAGe PRODUCTS
14-18
FRAMLeSS MODULe COMPATIBILITY
DISCLAIMeR
This manual describes proper installation procedures and provides necessary standards required for product reliability.
Warranty details are
. All installers must thoroughly read this manual and have a clear understanding
of the installation procedures prior to installation. Failure to follow these guidelines may result in property damage, bodily
injury or even death
.
IT IS THe INSTALLeR’S ReSPONSIBILITY TO:
• Ensure safe installation of all electrical aspects of the array. All electrical installation and procedures should be
conducted by a licensed and bonded electrician or solar contractor. Routine maintenance of a module or panel shall
not involve breaking or disturbing the bonding path of the system. All work must comply with national, state and local
installation procedures, product and safety standards.
•
Comply with all applicable local or national building and fire codes, including any that may supersede this manual.
• Ensure all products are appropriate for the installation, environment, and array under the site’s loading conditions.
• Use only IronRidge parts or parts recommended by IronRidge; substituting parts may void any applicable warranty.
and
to confirm design specifications.
• Ensure provided information is accurate. Issues resulting from inaccurate information are the installer’s responsibility.
• Validate foundation parameters prior to installation, as a local geotechnical report may be required to assess ground
conditions. We recommend consulting with a local engineer familiar with local regulations and build site requirements,
including soil conditions, terrain and load criteria. All parameters may impact foundation requirements.
• Ensure bare copper grounding wire does not contact aluminum and zinc-plated steel components, to prevent risk of
galvanic corrosion.
• If loose components or loose fasteners are found during periodic inspection, re-tighten immediately. If corrosion is
found, replace affected components immediately.
• Provide an appropriate method of direct-to-earth grounding according to the latest edition of the National Electrical
Code, including NEC 250: Grounding and Bonding, and NEC 690: Solar Photovoltaic Systems.
• Disconnect AC power before servicing or removing modules, AC modules, microinverters and power optimizers.
• Review module manufacturer’s documentation for compatibility and compliance with warranty terms and conditions.