Page 8
|
| (800) 227-9523
2013 v1.13
Rails with Integrated Grounding
Installation Manual
Electrical Considerations
Note: IronRidge Standard (XRS) and Light (XRL) Rail Mounting Systems with Integrated Grounding must be used with UL1703 listed
PV modules and must be installed per PV module manufacturer’s installation instructions. All electrical installation and procedures should
be conducted by skilled, licensed and bonded electricians or solar contractor. All work must comply with all national, state and local
installation procedures, product and safety standards. These standards include but are not limited to applicable National Electrical Code
(NEC®) sections, National Electrical Installation Standards (NEIS™), UL Standards, and OSHA Regulations.
Basic Grounding Diagram
A. IronRidge Grounding Lugs and Wiley Electronics, LLC #WEEB-6.7 are approved for use with this system.
B. The Rail to Rail (Splice) Connection requires proper grounding on rails with grounding lugs by using one of the two Rail to Rail
Connection methods described in Step 3 of this manual.
C. A minimum 10 AWG solid copper grounding conductor must be used to properly ground the system, as shown below.