Page 7
|
| (800) 227-9523
2013 v1.13
Rails with Integrated Grounding
Installation Manual
Grounding Mid Clamp
D. Once the first PV module is in place, loosely assemble hardware and Grounding Mid Clamp as shown below.
E. Next, slide second PV module into position underneath the Grounding Mid Clamp and secure with hardware. Ensure the
Grounding Mid Clamp teeth are in contact with both of the PV module frames and the T-Bolt is properly aligned in track. T-Bolt
indent should be perpendicular to rail.
F. Repeat steps for other clamp and modules.
End Clamp
G. Secure the last PV Module with an End Clamp repeating steps above.
1/4” Hex Nut
Grounding
Mid Clamp
1/4” T-Bolt
Torque to 84 in-lbs
Step 6. Installing End Caps
A. Firmly press End Caps on with hand or rubber mallet.
T-bolt Indent