Screw two Rafix Bolts
(H7) into the Left Side
(A) and Right Side (B)
where indicated.
#5
H7
Place the Left Sides
(A), Right Sides (B) and
Shelves (G) as shown.
Insert the Flush Rafix
Cams (H11) into the
sides and Rafix Cams
(H6) into the shelf and
work surface where
indicated.
#4
CCB
CCA
Position a Shelf (G) to a Left
Side (A) with the cord notch
oriented as shown. Secure in
place using the cams.
#6
H6
CORD NOTCH
A
G
H6
C
(CCB)