SFH220,240
100
2. ADJUSTMENT OF LINKAGE
2.1. ADJUSTMENT OF MAXIMUM LIFTING HEIGHT
Be sure to adjust the lifting height of each side as
follows.
Max.height:A
SCMA54F A=490mm SMM54F A=495mm
SCMA48F
CAUTION:
Incorrect adjustment may lead hitting
between the step and gear box of mower
deck or shortening of the minimum ground
clearance.
2.2. ADJUSTMENT OF UP-STOP HEIGHT
a. Shut off the engine.
b.
Turn the PTO Iever to the ON position to lift up the
lower link.
c.
Measure the ground clearance of the middle of
lower link pin at which the PTO Iever completely
turn to the OFF position and adjust the height.
Adjust the lifting height of each
side (Rand L ) using adjusting bolt.
Be sure to lock with locknut.
Be sure to lock with locknut.
Max height:AMax height:A
UP-STOP function check (SFH220/240)
side PTO lever is ON position with lift arm lowest
position
↓
Operate the lift lever to UP.
・
When the height of hole center to attach the mower
deck is at 400mm from ground, the side PTO lever
is in the off position
・
Not be able to turn to the ON position at over 400
mm from ground.
Adjust the UP-STOP cable as the height to the position
becomes 400 mm from the ground.
Summary of Contents for SBC550FH
Page 1: ...SFH240 SFH220 SCMA48F SCMA54F SMM54F SBC550FL SBC550FH MODELS I S E K I F R O N T M O W E R S ...
Page 33: ...SFH220 240 32 ...
Page 34: ...ISEKI FRONT MOWERS FRONT MOWER SECTION ...
Page 35: ......
Page 92: ...WIRING HARNESS CABLE 91 WIRING HARNESS CABLE Exept G type ...
Page 93: ...SFH220 240 92 G type ...
Page 94: ...ISEKI FRONT MOWERS MOWER DECK SECTION SCMA54F SCMA48F SMM54F SSM54F SFH240F B SFH240F SFH220T ...
Page 95: ......
Page 138: ...ISEKI FRONT MOWERS COLLECTOR SECTION ...
Page 139: ......
Page 150: ...CHAPTER 6 TROUBLESHOOTING 149 ...
Page 151: ...SFH220 240 150 ...