50
SERVICE MANUAL FOR SGR19 & SGR17
Fig. 3-105
• Sub-assemble the pump cam and the thrust plate
in advance, paying attention to thrust plate di-
rection.
Fig. 3-106
• Insert the starting spring pin into the cylinder
block and install the starting spring.
Fig. 3-107
• Install the injection cam gear assembly.
• Retain the injection pump cam shaft with the
thrust plate and tighten the gear to the specified
torque.
Specified torque
0.8 kgf·m (6 ft·lbs)
Y
Y
Y
X
X
X
0
0
0
Injection
pump
gear
Idle gear
Camshaft
gear
Crankshaft
gear
Fig. 3-108
• Install the idle gear.
Apply engine oil to the bore of the gear in ad-
vance.
Align respective timing marks with those of other
gears.
Fig. 3-109
• Installation of the injection pump
Tighten the bolts to the specified torque in se-
quence as shown in the figure.
Specified torque
0.8
±
0.2 kgf·m
Note:
Remember to install adjusting shims.
Summary of Contents for SCM49
Page 1: ...S E R V I C E M A N U A L I S E K I L A W N M O W E R S LAWN MOWERS MOWER DECKS SCM48 SCM54 ...
Page 7: ...7 CHAPTER 1 INTRODUCTION 3 EXTERIOR VIEW AND DIMENSIONS 1935 mm 1965 mm 1100 mm 1265 mm ...
Page 36: ...36 SERVICE MANUAL FOR SGR19 SGR17 Fig 3 55 III 3 CYLINDER BLOCK 1 EXPLODED VIEWS ...