IS9100
—
MDC
2
ISEO
These instructions may only be used in conjunction with the mounting instructions
for the IS9100.
Especially the safety instructions on page 3 of the IS9100 mounting instructions have
to be considered !
Contents
Page
1.
Preparation of operator at active leaf
3
2.
Preparation of operator at passive leaf
5
3.
Preparation of kit ACE
6
4.
Installation of operators
9
5.
Linking the operators
11
6.
Operators commissionning
12
List of tool needed for the installation :
– Open-end wrench of 4 - 9 - 12 - 13
– Hex wrench of 5 (suggested length 130 mm)
– Metal saw
– Tape measure
Summary of Contents for MDC IS9100
Page 1: ...Mounting instructions IS9100 MDC ...
Page 15: ...Notice de pose IS9100 MDC ...