Manual No. 0183B
20/29
IPC Series Service Manual
Chapter 4 Maintenance
4.1 Disassembly Procedure (Small Size: 3kg
•
6kg)
The seal restricts the peel according to the country by a no report and doing as wanting
put it. Follow the relevant procedure for the respective countries.
4.1.1 Base
Replacement
Disassembly procedure
1. Remove dry batteries when using batteries. Remove the AC adaptor when using the AC
adaptor.
2. Remove four foot levels.
3. Peel off the approval seal.
4. Remove the four M4×10 screws.
5. Lift the base, and pull out the battery harness from CN2 of main board PS-005.
Assembly procedure
1. Perform in reverse order to disassembly.
2. The approval seal material is a void seal. It is not possible to use it again. Use a new approval
seal.