MEASUREMENT AND ASSEMBLY MANUAL 

Validity of  the manual: 1. 9. 2014 

Then click the upper cover profile with the side covers into the basic profile holders; it must be kept in the plastic holder 

and must be located symmetrically in the centre of the window.  

  secure the chain limiter; plastic windows and wooden Euro windows can only be secured into the glazing bar and the 

holder for fixation of the lever must be mounted for the version with the lever.  

  check the function of the blind 

 

ATTENTION! 

Pursuant to the EN 13120:2014 standard, window blinds shall be installed in accordance with the 

following instructions: 

 

 

 

 

 

Chain: 

If a breakaway coupler is used: 

The chain length must be limited as follows: 

1)  If installation height (H0) is not specified, the chain length (H2) shall be less than or equal to 2/3 of the blind height 

(see Fig.

): H2 ≤ 2/3 H. 

2)  If installation height (H0) is specified, the distance from the floor to the bottom part of the pull cord (H1) shall be at 

least 0.6 m: H1 > 0.6 m. 

A dangerous loop must be eliminated when a mass of 6 kg is applied or within 5 seconds of application. 

Summary of Contents for SYSTEM 25

Page 1: ...chart with a tolerance of 1 mm It is recommended to consult with the manufacturer for dimensions outside the stated limits H height is measured the same as the width in three points including sealing...

Page 2: ...20 2 mm hole for tightening pin 3 2 mm for plastic and Al windows 3 mm for wooden windows INSPECTION before assembly we recommend inspecting all the parts after the delivery of the goods to prevent an...

Page 3: ...ndow Fig assembly from upwards Fig assembly from the front insert the nylon with the knot into the hole and press the pin When drilling these holes ensure that the span of the holes to the glazing bar...

Page 4: ...th the lever check the function of the blind ATTENTION Pursuant to the EN 13120 2014 standard window blinds shall be installed in accordance with the following instructions Chain If a breakaway couple...

Page 5: ...the bottom part of the pull cord s H1 shall be at least 1 5 m see Fig H1 1 5 m b The distance between two loop strands shall not exceed 50 mm at the output from the fixed tensioning device THE PULLEY...

Page 6: ...6 If installation height H0 is specified the distance from the floor to the bottom part of the pull cord s H1 shall be at least 1 5 m see Fig H1 1 5 m The pull cords shall meet the following requireme...

Page 7: ...EASUREMENT AND ASSEMBLY MANUAL Validity of the manual 1 9 2014 7 ILLUSTRATIVE ASSEMBLY OF THE BLIND WITHOUT THE COVER PROFILE ASSEMBLY ASSEMBLY WITH COVER PROFILE CONSTRUCTION CHAIN CORD HANDLE ENGINE...

Page 8: ...the glazing bar does not allow drilling holes to secure the tightening pins into the glazing bar from upwards choose the option of drilling the holes for pins into the face of the glazing bar In this...

Page 9: ...MEASUREMENT AND ASSEMBLY MANUAL Validity of the manual 1 9 2014 9 ILLUSTRATIVE ASSEMBLY OF THE BLIND WITHOUT THE COVER PROFILE...

Reviews: