background image

Earth

Safe

Fig. 4:

Design of the foundation for erecting the tower 

The soil must have a sufficient load-bearing capacity. The size and structure of the 

foundation depend on the soil characteristics.

Recommendation:

Ask a qualified structural engineer for advice regarding the optimal 

design of the foundation.

Fig. 5:

Suitable guying system 

7

.2.2

Tower foundation

1

2

of 2

Translation of the original instructions iSTA wind turbine system 

2

4

.0

7

.201

8

I00

Summary of Contents for i-1500 Ongrid

Page 1: ...SAVE SAVE ENERGY PLANET TRANSLATION OF THE ORIGINAL INSTRUCTIONS Keep handy at the place of use Wind turbine system i 2000 Ongrid...

Page 2: ...orised representative 5 2 4 Warranty and liability 6 2 5 Product feedback 6 3 Technical Description 6 3 1 Intended use 6 3 2 Reasonably foreseeable misuse 6 3 3 Main components 7 3 4 Main components o...

Page 3: ...1 Emergency shut down 16 10 Maintenance 17 10 1 Safety precautions during maintenance work 17 10 2 Inspection and maintenance schedule 17 10 3 Maintenance and cleaning by the user 17 11 Troubleshootin...

Page 4: ...turbine system 2 2 Conventions used in this translation of the original instructions Safety information is always identified by a signal word and in some cases also by a hazard specific symbol DANGER...

Page 5: ...ation Note Indicates general information and recommendations 2 3 Name and address of the manufacturer and his authorised representative Table 3 Manufacturer Table 4 Authorised representative Name Fast...

Page 6: ...the limits of use described above are considered to be contrary to the intended purpose The manufacturer is not liable for any damage resulting from such use No liability will be accepted by the manuf...

Page 7: ...and their functions Wind turbine 1 Converts wind energy into electrical energy 2 Grid Tie Inverter Converts energy from turbine Ac Grid Tie 3 Dump Load It absorbs excess current from the inverter 1 2...

Page 8: ...to the tower 1 Table 6 Main components of the wind turbine and their functions 5 2 1 3 4 6 7 4 1 Nose 1 2 Rotor blade 3 3 Hub for holding the blades 1 4 Generator for producing electricity 1 5 Boom f...

Page 9: ...n 60 Current 3 phase AC Start of charging Approx 3 m s wind speed Hub flange Cast Steel Max Speed rpm 1000 EN 61000 6 1 electromagnetic compatibility susceptibility Test standard Blade Color Black or...

Page 10: ...ns All work on the wind turbine system must be carried out by authorised persons Such persons must be familiar with the safety devices and regulations prior to carrying out the work Authorised persons...

Page 11: ...sufficient height refer to Fig 3 Obstacles are defined as houses hedges trees hills etc When choosing the place of use make sure adequate room is available to tilt the tower and blades if necessary H...

Page 12: ...size and structure of the foundation depend on the soil characteristics Recommendation Ask a qualified structural engineer for advice regarding the optimal design of the foundation Fig 5 Suitable guyi...

Page 13: ...process requires calm weather conditions Fig 6 Assembling the wind turbine 7 3 Unpacking the components 7 4 Assembling the wind turbine WARNING 5 1 4 2 3 6 3 For installation select sheltered place Ho...

Page 14: ...tion Distance between generator and charge controller m 11 11 18 18 29 20 44 44 68 68 110 Move rotor to Y position see Fig 7 Carefully release rotor blade Observe in which direction the rotor turns th...

Page 15: ...able shrink tube over each wire of the cable Twist and solder each wire of the cable to the wire from the generator Short circuit all 3 phases to activate the generator brake 1 1 When using the iSTA B...

Page 16: ...has been removed Switch on the wind turbine system section 7 1 Carefully tilt the wind turbine Clean the wind turbine section 9 3 8 1 Switching on the wind turbine system 8 2 Restart after an emergenc...

Page 17: ...Inspect for damage Wind turbine Check the bolts Electrical wiring Inspect the cables for damage Table 11Inspection and maintenance schedule WARNING Danger due to damaged parts Shut down the wind turbi...

Page 18: ...rbine system produces too little power Contact the manufacturer or a specialist dealer Cable cross section does not match installed cable length Match the cable cross section correctly Table 12Errors...

Page 19: ...the tower On the ground Detach the rotor blades from the generator Detach the generator from the tower and disconnect the electrical wiring Where necessary dispose of the individual components in cons...

Page 20: ......

Page 21: ...0 Load 10 14 21 Main components Place of use 12 13 Strain relief Tail vane 8 Transformer 16 Wind classes 13 Rotor blade 8 9 15 16 17 19 20 22 14 Index Cable cross section 16 20 Translation of the orig...

Page 22: ...EarthSafe 15 Notes 22 of 24 Translation of the original instructions iSTA wind turbine system 24 07 2018 I00...

Page 23: ...EarthSafe 16 Performance Charts Translation of the original instructions iSTA wind turbine system 24 07 2018 I00 23 of 24...

Page 24: ...EarthSafe 17 Certificates 24 of 24 Translation of the original instructions iSTA wind turbine system 24 07 2018 I00...

Page 25: ...lation of the original instructions iSTA wind turbine system 24 07 2018 I00 Fast Trading LTD Ul Stanc onna No 64 Et 2 BG 8500 Aytos BULGARIA 359 87 7819900 www istabreeze com ISTA Breeze No part of th...

Reviews:

Related manuals for i-1500 Ongrid