background image

Earth

Safe

Ambient temperature: -25 to +40°C

Place of use: Max. SWTS Class III acc. to EN 61400-2

The wind turbine system is in conformity with the European Machinery Directive 

2006/42/EC provided only original iSTA Breeze components are used and subject 

to proper erection. The use of components from other manufacturers as well as 

modifications or changes to the wind turbine system by the user are prohibited and 

could render the declaration of conformity invalid!

Any residual risks which arise as a result of operation or maintenance are 

described in the relevant sections of these instructions.

All work on the wind turbine system must be carried out by authorised persons!

Such persons must be familiar with the safety devices and regulations prior to 

carrying out the work.

Authorised persons are defined as follows:

Operating mode

Necessary qualifications

Erection

Suitably trained persons

Normal operation

Trained personnel

Cleaning

Trained personnel

Maintenance

Suitably trained persons

Repair

Manufacturer

Table 8 Personnel requirements

Ambient temperature: 

-15

 to +40°C

 

Storage location: Dry, frost-free

5

.1.1

Storage

5

.1.2

Operation

6

.1

Modifications or changes by the user

6

.2

Residual risks

6

.3

Personnel requirements

6

                 - 

Safety 

I

nformation

 -

1

2

of 2

8

Translation of the original instructions iSTA wind turbine system 

2

4

.0

7

.201

8

I00

5

.1

Permissible operating and storage conditions

Summary of Contents for i-300

Page 1: ...SAVE SAVE ENERGY PLANET TRANSLATION OF THE ORIGINAL INSTRUCTIONS Keep handy at the place of use Wind turbine system i 300 i 500 L 500 Air Speed...

Page 2: ...anslation of the original instructions 4 2 2 1 Other symbols used 5 2 2 2 Information 5 2 3 Name and address of the manufacturer and his authorised representative 5 2 4 Warranty and liability 6 2 5 Pr...

Page 3: ...3 of 28 7 6 Erecting the wind turbine 17 8 Normal Operation 18 8 2 Restart after an emergency 18 9 Shutting down the Wind Turbine System 18 10 Maintenance 19 10 1 Safety precautions during maintenanc...

Page 4: ...turbine system 2 2 Conventions used in this translation of the original instructions Safety information is always identified by a signal word and in some cases also by a hazard specific symbol DANGER...

Page 5: ...dicates general information and recommendations 2 3 Name and address of the manufacturer and his authorised representative Name ALTINEL ENERJI DIS TIC ELEK ELEKTRONIK SAN VE TIC LTD STI Phone 0090 212...

Page 6: ...the limits of use described above are considered to be contrary to the intended purpose The manufacturer is not liable for any damage resulting from such use No liability will be accepted by the manuf...

Page 7: ...ind energy into electrical energy 2 Switch switch AC Emergency Stop Button optional optional Type i HCC 800 Generates electrical voltage 12 24 48 VDC The iSTA Breeze charge controller has 40 A fuse pr...

Page 8: ...1 Nose Cover 1 2 Rotor blade 3 3 Hub for holding the blades 1 4 Generator for producing electricity 1 5 Body trage Element 1 6 Tail vane for turning the blades into the wind 1 Note For proper operati...

Page 9: ...i 500 L 500 Air Speed 12V 24V 22A 11A 12V 24V 24V 48V 35A 18A 35A 18A 35A 18A free Weight kg 5 9 6 1 6 6 7 8 Max power Housing material Plastic Plastic Aluminium Aluminium Plastic Hub flange Plastic...

Page 10: ...aking system in three steps to avoid immediate blockage of the turbine Increasing the lifetime of the stator Protection against overcharging overdischarge short circuit overload and against incorrect...

Page 11: ...d If the red light is on it means that the charge controller is braking the wind generator e g when the battery is full or when the wind speed is too high Step 1 Connect the charge controller as it is...

Page 12: ...ns All work on the wind turbine system must be carried out by authorised persons Such persons must be familiar with the safety devices and regulations prior to carrying out the work Authorised persons...

Page 13: ...sufficient height refer to Fig 3 Obstacles are defined as houses hedges trees hills etc When choosing the place of use make sure adequate room is available to tilt the tower and blades if necessary H...

Page 14: ...size and structure of the foundation depend on the soil characteristics Recommendation Ask a qualified structural engineer for advice regarding the optimal design of the foundation Fig 5 Suitable guyi...

Page 15: ...bly at windy sites Choose an assembly site which is sheltered from the wind The assembly process requires calm weather conditions Fig 6 Assembling the wind turbine Repellerblatt 1 mit flacher Seite an...

Page 16: ...110 Cable cross section mm 2 5 4 6 10 16 25 Distance between generator and charge controller m 11 11 18 18 29 20 44 44 70 68 113 Cable cross section mm 2 5 4 6 10 16 25 Move rotor to Y position see Fi...

Page 17: ...efer to Fig 5 Remove the short circuit Fig 8 Connecting the three wire cable to the generato Pull heat shrink tubing over the solder joint and shrink Pull a suitable shrink tube over each wire of the...

Page 18: ...short circuited via the iSTA Breeze charge controller The wind turbine is braked Press the Charge controller OFF button on the iSTA Breeze charge controller Operation is interrupted Press the Charge c...

Page 19: ...Inspect for damage Wind turbine Check the bolts Electrical wiring Inspect the cables for damage Table 11Inspection and maintenance schedule WARNING Danger due to damaged parts Shut down the wind turbi...

Page 20: ...e tower vertically Tower bends in the wind Design a more robust tower Tower foundation has too much clearance Reduce the clearance to a minimum Wind turbine system produces too little power Wind turbi...

Page 21: ...roughly identical in identical wind conditions 5 What is the battery voltage How old is the battery or batteries 6 Which loads are connected to the battery 7 Are solar panels also connected to the ch...

Page 22: ...the tower On the ground Detach the rotor blades from the generator Detach the generator from the tower and disconnect the electrical wiring Where necessary dispose of the individual components in cons...

Page 23: ...EarthSafe Fig 9 Declaration of conformity Translation of the original instructions iSTA wind turbine system 24 07 2018 I00 23 of 28 13 Declaration of Conformity...

Page 24: ...ions iSTA wind turbine system 24 07 2018 I00 Adapter stud 8 Battery 7 10 11 20 21 Cable cross section 16 20 Charge controller 7 10 11 16 18 20 21 Foundation 14 20 Load 10 14 21 Main components Place o...

Page 25: ...EarthSafe 15 Notes 24 07 2018 I00 Translation of the original instructions iSTA wind turbine system 25 of 28...

Page 26: ...EarthSafe 16 Performance Charts 26 of 28 24 07 2018 I00 Translation of the original instructions iSTA wind turbine system...

Page 27: ...EarthSafe 24 07 2018 I00 Translation of the original instructions iSTA wind turbine system 27 of 28 17 Certificates...

Page 28: ...Serkan r t Riemenstr 31 DE 74906 Bad Rappenau 0049 07264 8899740 www istabreeze com ISTA Breeze No part of this document may be copied or reproduced Translation of the original instructions iSTA wind...

Reviews: