In case of boiler installation in rooms where temperature can drop down to 0°, it is advisable
to fill the heating circuit (included the primary circuit of the storage unit and the relevant coil)
with an antifreeze liquid specific for heating systems, propylenic glycol based, following the in
-
structions of its manufacturer. Pay attention to the correct product concentration: adding those
substances to the heating water in incorrect dose could lead to the deformation of the seals and
cause unusual noises during operation.
ITALTHERM S.r.l. will not be held responsible for consequent damages.
Instruct the User about the antifreeze function of the boiler and about the antifreeze product
added in the heating system.
Warnings for the installation of optional kits or special systems
Floor heating system
The safety thermostat(s) that protects the floor against overheating (that could damage the
cladding, the structure or the system itself) must be installed on the flow starting end of the
serpentine embedded in the floor itself. It should not installed on the system flow pipe in prox
-
imity of the boiler, otherwise frequent and unjustified boiler locks, caused by its triggering, are
possible.
Moving the boiler
The boiler could be damaged if the precautions here described are not respected.
3
4
1
00207 A 00
2
3
4
1
00207 A 00
2
a)
Remove the hydraulic connections door
1
: unscrew
the 3 screws
2
fixing the door support, then draw
the door outside and remove it;
b)
Remove the front panel
3
: on the upper side, unscrew the screws
4
and
remove the panel upwards;