5. MACHINE OPERATION
1 Input power 220-240V.
2 Open electronic lock put to "ON" ubiety.
3 Locating power put to "MAJOR" ubiety, auto matric put
through power. (A each power put through phase difference
1 second time. )
4 Locating power put to "NEXT" ubiety, aux at discretion
put through output power socket strips.
7