26
ä Attention
!
Increasing the maximum speed causes more noise
and higher energy consumption.
ä Attention
!
If the power fails during the commissioning phase,
wait at least 2 minutes after the power has been
restored! All ventilation units in the immediate vicinity
will also be in log-on mode for the first 2 minutes!
5.
Commissioning
Each remote control must be logged in separately. Up to
20 RF devices can be registered and put into operation.
Prior to commissioning:
●
The ventilation unit must be mounted.
●
The ductwork must be mounted.
●
The window and/or facade gratings must be
fully open.
●
External and internal doors must be closed.
●
There must be sufficient flow-through space
under the inner doors.
●
The adjustable valves must be fully open in
all
rooms.
Go through the following steps to get the ventilation
unit up and running correctly:
a)
Make sure that the ventilation unit has been
de-energized for 15 seconds.
b)
Insert the plug of the ventilation unit into the
wall socket.
c)
Sign on the RF remote control(s) for the ventilation
unit by pressing 2 buttons diagonally across from
each other. The ventilation unit will briefly vary in
speed to confirm registration.
If only a wired 3-position switch is installed, you
can skip steps a to c.
d)
Now switch on the ventilation unit and regulate the
ventilation capacity of each valve according to the
legal requirements.
Summary of Contents for 03-00398
Page 1: ...Installation use Itho Daalderop CVE S ECO D...
Page 2: ...Original document...
Page 12: ...12...
Page 22: ...22 ithodaalderop 4 Operation 1 2 3 Q 0 4 5 6 0 J 000 S...