4
Proving the Intelis Gas Meter Using the
Honeywell SNAP Proving System
This section provides the information to set up an Intelis Gas Meter using a Honeywell SNAP
proving system.
Note:
Proving the Intelis Gas Meter requires Honeywell SNAP prover software .NET X.Y.
Temper meters unpackaged in the proving area for 24 hours prior to testing. If tempering is not
possible,follow the instructions described in
Tempering the Meter by Exercising on page 20
If the meters are tempered, continue to
Setting Up the Prover on page 21
Warning!
Follow your company’s standard operating procedures regarding the use
of personal protection equipment (PPE). Adhere to guidelines issued by your
company in addition to those contained in this document when proving meters.
Adjust the proving table to accommodate the height of the Intelis Gas Meter. If necessary, use
the Intelis Gas Meter prover stand (Itron part number FIX-7100-001). Place the prover stand on
the prover table and set the meter on the stand. See the image below for reference.
Note:
To hold the meter properly in place, the meter should be placed in the fixture such that
the meter flange is below the fixture's edge.
08 July 2020
815-0154-00 REV 000
Itron, Inc. Page 19 of 66