Voltage and tension are indicated on the nameplate and on the technical
specifications of this manual. Variation on voltage above the 10% stated on the
nameplate could result on damages or prevent the machine start-up.
The line up to the base of the socket shall have a minimum section of 1.5 mm
2
.
Check that the voltage of the net and the indicated one is the same.
START-UP
Previous Checkup
a) Is the machine leveled?
b) Are voltage and frequency the same as those on the nameplate?
c) Are the discharges connected and operating?
d) Are the air circulation and site temperature appropriate?
ROOM
CONSUMPTION
MAXIMUM 43ºC (109.40ºF)
35ºC (95ºF)
MINIMUM
5ºC (41ºF)
5ºC (41ºF)
e) ** Is water pressure appropriate?
MINIMUM
1 kg./cm2
MAXIMUM 5 kg./cm2
NOTE: If the inlet pressure of the water is superior to 5 kg/cm2, install a pressure
reducer.
START-UP
Once the installation instructions are followed (ventilation, site conditions,
temperatures, water quality, etc.), proceed as follows:
1) Connect the machine to the drinking water network.
2) Open the water inlet. Verify the existence of leakages.
3) Connect the machine to the electrical network.
4) Set the time of the machine (see the user menu electronic operation, adjust
time)