V
10/04
OptiGun 2-A(X) (GA02) Automatic powder gun
Operation
•
23
Operation
Start-up and powder coating
Make sure first, that all electrically conductive parts within 5 m of
the coating booth are grounded!
1. Check the powder fluidization
2. The fitted gun must be pointed towards a grounded work piece
in the coating booth
3. Switch on the gun control unit
4. Adjust the coating parameters or select one of the programs.
Check by observing the LED displays
5. The workpieces can be coated now
Shut-down
1. Switch off the powder gun control unit. The adjustments for
high voltage, rinsing air and powder output remain stored
2. If working interruptions take place, such as lunch time, night
etc. the main compressed air supply is to be interrupted
Setting powder output and powder cloud
The powder output depends on the powder type and the adjusted total air
volume (see the OptiTronic control unit operating instructions).
Setting total air volume
The total air volume is depending on the powder hose length, the number
of hose curvatures, the hose diameter, the conveying air pressure and
the supplementary air.
The operation mode of the injector and the effect of the supplementary
air are described in the corresponding injector operating instructions.
The adjusted value of the total air volume can be left as it is, as long
as the same diameter powder hose is used.
If the hose diameter changes, the total air volume must be reset!