V
05/10
20
Start-up and operation
OptiFlex B manual coating equipment
2.2
2.3
Gun
Aux
Power IN
Air supply IN
2.1
6 - 10 bar
87 - 145 PSI
1.5
1.4
1.3
1.2
Connecting guide - overview
Preparation for start-up
Preparing the powder container
1. Swivel the fluidizing/suction unit to the side
2. Place the open powder container on the vibrating table
3. Place the fluidizing/suction unit onto the powder
Switching on the booth
The coating booth is switched on according to the corresponding user
manual.
Start-up
Switch on the control unit
1. Press the power switch
ON
.
The displays illuminate and the control unit is ready for operation
Note:
The further start-up procedure for the OptiFlex B manual coating
equipment gun is explicitly described in the OptiStar CG07control
unit operating instructions (chapter "Initial start-up" and "Daily
start-up")!
Filter unit
Injector
Gun
Fluidizing air