2.5 Maintenance
The ongoing maintenance of this unit can be carried out either by the person
normally in charge of maintaining the building or through a contract with a well-
reputed service company.
2.6 Handling of refrigerant
The following information summarises the requirements and guidelines for hand-
ling the refrigerant used in cooling units. For further information, see the F-gas
Regulation (EU/517/2014 on fluorinated greenhouse gases) and the Swedish
Refrigerant Regulation (SFS 2016:1128). The purpose of the regulations is to
contribute to achieving EU goals for reduced climate impact in accordance with
the Kyoto Protocol.
Operator responsibilities
Generally speaking, the unit operator must:
• Minimise and prevent leakage
• Take corrective action to remedy any leakage that arises
• Ensure that the service and repair of the refrigerant circuit is carried out by a
certified refrigeration technician
• Ensure that refrigerant is handled in an environmentally secure manner and
in accordance with national regulations.
By operator, we refer to the European Parliament’s definition: “...the natural
or legal person exercising actual power over the technical functioning of the
equipment and systems...”.
Leakage inspection and registration
The following applies to one-piece units with 5 CO₂ e(tonnes) refrigerant content
or more per circuit – Envistar Compact with StarCooler (code ACEC, size 16):
•
Leakage inspection
must be carried out by a certified refrigeration techni-
cian:
- When installing/commissioning the unit
- Periodically at least once per 12 months, i.e. no more than 12 months
between inspections
- Within one month after any work is performed (for example sealing a leak,
replacing a component).
• The operator must
record
events, such as the volume and type of refrigerant
topped up, refrigerant taken into possession, results of inspections and work
done, person and company who carried out service and maintenance.
For size 04-10, no periodic leak detection or record keeping is needed, but the
requirement for leak inspection during installation does apply.