C78 ENT M50
INSTALLATION INSTRUCTIONS
3
FEBRUARY 2003 EDITION
INSTALLATION OVERVIEW
1. Fuel tank with suction/return assembly. - 2. Electrical system cabinet - 3. Servo-throttle - 4. Instrument panel - 5.Throttle
lever - 6. Engine and ventilation air intake - 7. Batteries - 8. Electronic Management Box (EMB) - 9.Ventilation air exhaust -
10. Sea water suction and decanting filter - 11. Exhaust gas and sea water drain pipe - 12. EMB power supply wiring -
13. Indication and control panel wiring - 14. Linkage for throttle potentiometer operation - 15. Power grid wiring from
battery to generator/electrical starter motor - 16. Fuel tank feed and return pipe.
The figure shows the set of components of an installation including those supplied, as standard or optional items, with the
engine equipment, and those supplied or built by the yard.The figure is meant to provide an overall picture of the operations
required for engine installation. Component positions and illustrations are not binding, but merely provided by way of indica-
tion, and they depend on the choices made by yard engineers according to their competence, to the spaces and the prescrip-
tions set out in the chapter that follows.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
Figure 1
81421
Summary of Contents for C78 ENT M50
Page 1: ...C78 ENT M50 MARINE ENGINE INSTALLATION INSTRUCTION ...
Page 4: ...C78 ENT M50 IV FEBRUARY 2003 EDITION ...
Page 6: ...C78 ENT M50 OVERVIEW 2 FEBRUARY 2003 EDITION ...
Page 34: ...C78 ENT M50 DIAGNOSTICS 2 FEBRUARY 2003 EDITION ...
Page 37: ...C78 ENT M50 5 FEBRUARY 2003 EDITION NOTES ...
Page 38: ...C78 ENT M50 6 FEBRUARY 2003 EDITION NOTES ...