GridBee GS-9

Single Phase 

Operation & Maintenance Manual

Summary of Contents for Medora GridBee GS-9

Page 1: ...2020 Ixom www medoraco com 866 437 8076 info medoraco com O M_GS9_10012_20200811 GridBee GS 9 Single Phase Operation Maintenance Manual...

Page 2: ...Processes Ixom equipment continues to be at the forefront as the 1 world leader for in situ water body treatment 2020 Ixom www medoraco com 866 437 8076 info medoraco com Table of Contents 10014_2020...

Page 3: ...pment You can avoid hazards by following these safety instructions and applying some ordinary common sense when operating or servicing this unit Keep in mind that full operator attention and alertness...

Page 4: ...entative ELECTRICAL HAZARD WARNING THIS EQUIPMENT CONTAINS HIGH VOLTAGE ELECTRICAL SHOCK CAN CAUSE SERIOUS OR FATAL INJURY ONLY QUALIFIED PERSONNEL SHOULD ATTEMPT PLACEMENT OPERATION AND MAINTENANCE O...

Page 5: ...mply with all relative OSHA and local regulations while installing and performing any maintenance to the mixer circulation equipment Key OSHA Compliance Standards that must be followed and not limited...

Page 6: ...rain Relief Cord Fixture GS Core Unit 75 or 150 Electric Cord Not Pictured 75 or 150 Stainless Steel Chain Top of Tank Junction Box Cord Seal 2020 Ixom www medoraco com 866 437 8076 info medoraco com...

Page 7: ...6 7 9 910 9 8 1120 1 4 2 0 42 54 99 99 28 H Service Entrance to Motor Maximum Length In Feet Based on Service Factor Amps and 5 Voltage Drop Motor Rating 60 C and 75 C Insulation AWG Copper Wire Size...

Page 8: ...to protect from corrosion 7 Strain Relief Washer 8 Quick link for connecting retrieval chain and kellem grip to strain relief washer 9 Kellem grip to support cable weight and to provide strain relief...

Page 9: ...oxy Follow concrete epoxy manufacture s preparation and installation guidelines 7 A 3 4 dia minimum to 1 1 4 dia maximum hole drilled through hatch neck for electrical cord 8 Junction box mounted to e...

Page 10: ...pport I beam 9 Quick link 10 Kellem grip 11 A 1 5 16 dia hole drilled through panel and sealed with Lexel Locate penetration within arms reach of an access point 12 Eyebolt drilled through support I b...

Page 11: ...ugh cord seal Locate power source receptacle and flex con duit termination at customer preferred location of mixer control panel Terminate conduit using flex conduit with male thread end for panel mou...

Page 12: ...bottom of the tank penetration fitting Step 4 Pull the retrieval chain up until it is taught then mark off the desired distance the GS Mixer is to be suspended above the floor placing the quick link...

Page 13: ...ank However the mixer should stay clear at least 10 15ft away from a common inlet outlet pipe Radial Orientation It is best to orientate the mixer so the discharge slots are radial with the tank This...

Page 14: ...each splice individually sealed to protect from corrosion Top of tank Junction Box Not applicable for GS 12 Air Is the field wiring correct Requirements Is the mixer submerged with at least 2 0 75m of...

Page 15: ...ve probe on the black wire and the negative probe on the white wire that were disconnected 6 Record the reading Depending on the length and gauge of wires to the mixer the ohms should be approximately...

Page 16: ...r build up You should be able to move the impeller freely with no resistance See Figure 2 Step 4 Remove any debris if necessary Step 5 Place the white end plate back on the GS Mixer ensuring to line u...

Page 17: ...rication schedule required Automatic reset on winding thermal overload protection and surge arresters built in Mounted in flow sleeve for superior cooling and long motor life in submerged temperatures...

Page 18: ...d and provided with the purchased equipment is the valid warranty GridBee control panels cold weather hose kits air compressors and any optional accessories These items are considered buyout items for...

Page 19: ...on and other related subjects as required by OSHA to perform the necessary work to install or remove SolarBee and GridBee equipment and are knowlegeable in the regulations and standards of OSHA If you...